Common site pressures
- Large rooftop solar potential
- Fleet and employee EV charging
- Forklift and material-handling loads
- Constrained import capacity
- Multiple sites with different demand profiles
SOUNDONNEW ENERGY · UK
Assess a project
WAREHOUSES & LOGISTICS
For warehouse owners, occupiers, logistics operators and property teams planning solar, fleet charging or electrical expansion.
Discuss your warehouses & logistics project
THE COMMERCIAL CONTEXT
A credible BESS proposal must begin with measured demand, operating priorities and the connection—not a standard equipment assumption.
COMMERCIAL SYSTEM SPOTLIGHT
From £39,940 delivered. Assess the system against your site’s energy profile.
WHO THIS PAGE IS FOR
ASSESSMENT INPUTS
YOUR QUESTIONS, ANSWERED
Increase rooftop-solar self-consumption, Manage coincident charging peaks, Support phased fleet electrification. Suitability depends on measured site demand, tariffs, connection limits and approved engineering design.
289kWh describes energy capacity; 125kW is the rated output of the featured system. Selection requires half-hourly demand, peak power, solar generation and the intended discharge duration. A larger or smaller configuration may be appropriate.
Provide site location, half-hourly electricity data, available supply capacity, solar and EV plans, project timescale and installation scope. The current 289kWh offer starts at £39,940 delivered, subject to written quotation; installation and site works are separate.
SYSTEM PATHWAY
The appropriate configuration depends on usable site power, duration, operating strategy and the connection pathway.
Start with the 289kWh system