MANUFACTURING & FOOD

Match stored energy to shifts, processes and production peaks.

For engineering, operations and energy teams managing motors, cooling, process loads and onsite generation.

Discuss your manufacturing & food project
Soundon battery energy storage for manufacturing & food

THE COMMERCIAL CONTEXT

Start with the constraint.

A credible BESS proposal must begin with measured demand, operating priorities and the connection—not a standard equipment assumption.

Common site pressures

  • High-power process starts
  • Refrigeration and cooling loads
  • Shift-based demand patterns
  • Onsite solar or generation
  • Production continuity requirements

Potential BESS applications

  • Reduce appropriate production peaks
  • Improve renewable-energy utilisation
  • Coordinate flexible process loads
  • Support power-quality planning
  • Evaluate approved resilience use cases

COMMERCIAL SYSTEM SPOTLIGHT

289kWh / 125kW

From £39,940 delivered. Assess the system against your site’s energy profile.

See the system offer

WHO THIS PAGE IS FOR

The people shaping the project.

01Engineering Director02Energy Manager03Plant Manager04Operations Director05Sustainability Manager

ASSESSMENT INPUTS

Bring the evidence that changes the answer.

Half-hourly import/export data
Peak demand and supply capacity
Solar generation profile
Planned charging or new loads
Operating hours and critical loads
Target date and commercial objective

YOUR QUESTIONS, ANSWERED

Plan your storage project.

How can battery storage support manufacturing & food?+

Reduce appropriate production peaks, Improve renewable-energy utilisation, Coordinate flexible process loads. Suitability depends on measured site demand, tariffs, connection limits and approved engineering design.

Is a 289kWh battery the right size for our site?+

289kWh describes energy capacity; 125kW is the rated output of the featured system. Selection requires half-hourly demand, peak power, solar generation and the intended discharge duration. A larger or smaller configuration may be appropriate.

What information is needed for a quotation?+

Provide site location, half-hourly electricity data, available supply capacity, solar and EV plans, project timescale and installation scope. The current 289kWh offer starts at £39,940 delivered, subject to written quotation; installation and site works are separate.

SYSTEM PATHWAY

289kWh cabinet to multi-MWh container

The appropriate configuration depends on usable site power, duration, operating strategy and the connection pathway.

Start with the 289kWh system